Here's a question that trips up even experienced installers: you've wired the SLC loop perfectly, every detector is addressed, and the panel passes every diagnostic. Then inspection day comes, and the whole job gets flagged because a strobe in the back office is rated too low for the room it's covering.
Detection gets most of…
